Our Needs

Below are the needs of the school.

Teach First’ Course 2016 (Further £5,000 needed.)

ICT Course 2017 (Further £6,000 needed.)

Perimeter Wall  (£30,000)

Solar Heating System (£8,000)

Admin Block  (£63,000 needed.)

Science Lab Extension  (Further £35,000 needed.)

Some structural repairs to existing buildings (£30,000 needed.)

Girls boarding house